Skip to content

ItEr76S29WorkReports

Jeroen Baten edited this page Mar 9, 2018 · 1 revision

TWiki> LibrePlan Web>ItEr76S29WorkReports (20 Aug 2012, ManuelRego)EditAttach

Story summary WorkReports improvements
Iteration ItEr76Week01To33
FEA ItEr76S29WorkReports
Story Lead  
Next Story  
Passed acceptance test No

Acceptance Criteria

AnA08S15WorkReports

Additional Specification Comments

Implementation Notes

Improve work report lines filtering and report output

-- DiegoPino - 29 May 2012

Added option to filter by type: ALL, DIRECT and INDIRECT.

Increase number of results per page

-- DiegoPino - 29 May 2012

Page size increased to 15 rows per page.

Include summary line at the end of the report

-- DiegoPino - 29 May 2012

Added summary, showing filtered options and number of total tasks return and sum of total hours.

Add button to copy work report line

To be specified

 

Delay Causes

Final or Pending Considerations

 

Commits

%RPSHOWGITCOMMITS%

Tasks in this story

Tasks Est Spent To do Risk Reviewer Developer Task Name Start Date Est End Date End Date
Task 8 4.5 0 Low DiegoPino DiegoPino Improve work report lines filtering and report output 28/05/2012 02/06/2012 29/05/2012
Task 1 0.25 0 Low DiegoPino DiegoPino Increase number of results per page 28/05/2012 02/06/2012 29/05/2012
Task 2 1.5 0 Low DiegoPino DiegoPino Include summary line at the end of the report 28/05/2012 02/06/2012 29/05/2012
Task 0 0 0 Low DiegoPino DiegoPino Add button to copy work report line      

Copyright (c) by the contributing authors. All material on this collaboration platform is the property of the contributing authors.

Clone this wiki locally