Skip to content

[Architecture] Define topology, SLOs, RTO/RPO, scale, retention, and cost envelope #11

Closed

Description

@gnanirahulnutakki

Outcome

Establish measurable design bounds before selecting stateful infrastructure.

Scope

  • Define the initial regional topology, workload scale, availability assumptions, SLIs/SLOs, RTO/RPO, retention, and reference deployment cost bounds.

Acceptance criteria

  • Targets are numeric with a measurement method and exclusions.
  • Dev, small, and target-scale workload profiles are documented.
  • HA, backup, telemetry, NAT/egress, and storage cost assumptions include region and pricing date.

Test and evidence

  • Reviewed architecture decision and reproducible cost worksheet.

Dependencies

  • None.

References

Activity

  1. added
    priority:p0Critical prerequisite or correctness boundary
    decision-requiredRequires an explicit architecture or governance decision
    area:foundationGovernance, architecture, and repository foundation
    on Sep 1, 2026
  2. added a commit that references this issue on Sep 1, 2026
  3. gnanirahulnutakki commented on Sep 1, 2026

    @gnanirahulnutakki
    MemberAuthor

    Completion evidence

    Implemented and merged through PR #68.

    Exact post-merge proof

    • origin/main: dc3cf67b23442de21b9af4b95718422d6b661cbc
    • First parent: 39261a7135d6ff10c48fc6bb03a690d83c815cf2 (reviewed base)
    • Second parent: 49cfeaebfed57f2edfcaf6dd6bddb76f3cafb4dd (final reviewed PR head)
    • Merge tree and final-head tree are identical: 0af40257f95217f0c244e093709210b92f986586
    • ADR 0001 is accepted on main with acceptance date 2026-09-01 and all five review gates checked.
    • Root README links the ADR.

    Review proof

    • Codex completed cleanly on final head 49cfeae at 2026-09-01 10:13:54 UTC.
    • CodeRabbit completed its substantive incremental review on parent 26dbe99 at 2026-09-01 10:00:51 UTC; final 49cfeae changes only ADR status/date/checklist metadata.
    • Unresolved review threads at merge: 0.

    Validation and cost evidence

    • docs/architecture/cost-model/verify.sh: passed after merge.
    • sh -n, shellcheck, Markdownlint, and git diff --check: passed.
    • Credential-pattern and machine-path scans: clean.
    • Monthly estimates: developer USD 0.00; small USD 937.50 / USD 1,000 ceiling; target USD 2,627.40 / USD 2,650 ceiling.
    • The verifier now cross-checks the ADR cost summary against expected.tsv, preventing the reviewed worksheet and human-readable contract from drifting.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:foundationGovernance, architecture, and repository foundationpriority:p0Critical prerequisite or correctness boundary

    Type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions