Skip to content

Merge pull request #5093 from 2403905/issue-11046 #4281

Merge pull request #5093 from 2403905/issue-11046

Merge pull request #5093 from 2403905/issue-11046 #4281

Triggered via push February 24, 2025 10:09
Status Failure
Total duration 24s
Artifacts

docker.yml

on: push
Matrix: docker
Fit to window
Zoom out
Zoom in

Annotations

7 errors
docker (revad:edge-ceph, Dockerfile.revad-ceph)
The process '/usr/bin/docker' failed with exit code 1
docker (revad:edge, Dockerfile.revad)
The job was canceled because "revad_edge-ceph_Dockerfil" failed.
docker (revad:edge, Dockerfile.revad)
The operation was canceled.
docker (revad:edge-eos, Dockerfile.revad-eos)
The job was canceled because "revad_edge-ceph_Dockerfil" failed.
docker (revad:edge-eos, Dockerfile.revad-eos)
The operation was canceled.
docker (reva:edge, Dockerfile.reva)
The job was canceled because "revad_edge-ceph_Dockerfil" failed.
docker (reva:edge, Dockerfile.reva)
The operation was canceled.