Add new HI Beamspot to the Run-3 HI MC + change vertex smearing to use the estimated HI version#39758
Conversation
|
+code-checks Logs: https://cmssdt.cern.ch/SDT/code-checks/cms-sw-PR-39758/32616
|
|
A new Pull Request was created by @tvami (Tamas Vami) for master. It involves the following packages:
@malbouis, @yuanchao, @cmsbuild, @saumyaphor4252, @francescobrivio, @ChrisMisan, @tvami can you please review it and eventually sign? Thanks. cms-bot commands are listed here |
|
@cmsbuild , please test
|
|
test parameters:
|
|
+code-checks Logs: https://cmssdt.cern.ch/SDT/code-checks/cms-sw-PR-39758/32623
|
|
Pull request #39758 was updated. @malbouis, @yuanchao, @bbilin, @cmsbuild, @AdrianoDee, @srimanob, @saumyaphor4252, @kskovpen, @sunilUIET, @tvami, @ChrisMisan, @francescobrivio can you please check and sign again. |
|
@cmsbuild , please test |
|
+1 Summary: https://cmssdt.cern.ch/SDT/jenkins-artifacts/pull-request-integration/PR-70708b/28348/summary.html The following merge commits were also included on top of IB + this PR after doing git cms-merge-topic:
You can see more details here: Comparison Summary@slava77 comparisons for the following workflows were not done due to missing matrix map:
Summary:
|
|
@cmsbuild , please test |
|
+code-checks Logs: https://cmssdt.cern.ch/SDT/code-checks/cms-sw-PR-39758/32876
|
|
Pull request #39758 was updated. @malbouis, @yuanchao, @bbilin, @AdrianoDee, @srimanob, @saumyaphor4252, @kskovpen, @sunilUIET, @tvami, @ChrisMisan, @francescobrivio can you please check and sign again. |
|
+1 Summary: https://cmssdt.cern.ch/SDT/jenkins-artifacts/pull-request-integration/PR-70708b/28691/summary.html Comparison Summary@slava77 comparisons for the following workflows were not done due to missing matrix map:
Summary:
|
|
unhold
|
|
+alca |
|
@srimanob can you please re-sign? |
|
+pdmv |
|
+Upgrade Re-sign. |
|
This pull request is fully signed and it will be integrated in one of the next master IBs (tests are also fine). This pull request will now be reviewed by the release team before it's merged. @perrotta, @dpiparo, @rappoccio (and backports should be raised in the release meeting by the corresponding L2) |
|
+1 |
PR description:
Add new HI Beamspot as requested in https://cms-talk.web.cern.ch/t/request-for-new-run3-hi-mc-gt-updated-reco-bs-for-12-5-x/16447
The diff wrt to the prev GT is just the beamspot tag
https://cms-conddb.cern.ch/cmsDbBrowser/diff/Prod/gts/125X_mcRun3_2022_realistic_HI_v4/125X_mcRun3_2022_realistic_HI_v6
Change the input GEN-SIM to
CMSSW_12_5_1-125X_mcRun3_2022_realistic_HI_v5-v1created in the JIRA https://its.cern.ch/jira/browse/PDMVRELVALS-174PR validation:
RelVals have to be modified for the real test, @mandrenguyen will take care of that.
If this PR is a backport please specify the original PR and why you need to backport that PR. If this PR will be backported please specify to which release cycle the backport is meant for:
Not a backport but needs to go back to 12_5_X