Use estimated PbPb beam conditions for 2022 HI MC instead of pp beam conditions#39761
Use estimated PbPb beam conditions for 2022 HI MC instead of pp beam conditions#39761mandrenguyen wants to merge 2 commits intocms-sw:masterfrom
Conversation
|
hold |
|
hi Matt, sure, I can do that! thanks |
|
+code-checks Logs: https://cmssdt.cern.ch/SDT/code-checks/cms-sw-PR-39761/32622
|
|
Pull request has been put on hold by @mandrenguyen |
|
A new Pull Request was created by @mandrenguyen (Matthew Nguyen) for master. It involves the following packages:
@malbouis, @yuanchao, @bbilin, @cmsbuild, @AdrianoDee, @srimanob, @saumyaphor4252, @kskovpen, @sunilUIET, @tvami, @ChrisMisan, @francescobrivio can you please review it and eventually sign? Thanks. cms-bot commands are listed here |
|
Will be implemented in #39758 |
PR description:
Update the vertex smearing in 2022 HI MC RelVal workflows to use estimated PbPb beam conditions instead of defaulting to pp ones.
Complement to #39758 which updates the GT with reco beamspot that is compatible with this vertex smearing.
The relevant auto conditions are updated to point to this latest GT.
PR validation:
Needs to be tested with #39758
If this PR is a backport please specify the original PR and why you need to backport that PR. If this PR will be backported please specify to which release cycle the backport is meant for:
Will need a 12_5_X backport.
@tvami