Skip to content

Merge pull request #320 from predict-idlab/dependabot/pip/develop/att… #1221

Merge pull request #320 from predict-idlab/dependabot/pip/develop/att…

Merge pull request #320 from predict-idlab/dependabot/pip/develop/att… #1221

Triggered via push April 2, 2025 14:37
Status Failure
Total duration 2m 30s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 1.
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_10" failed
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed