Skip to content

Conversation

@aabughosh
Copy link
Collaborator

pr was merged so need to remove them

@aabughosh
Copy link
Collaborator Author

/retest

@aabughosh
Copy link
Collaborator Author

/payload-job periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ovn-two-node-arbiter-serial

@aabughosh
Copy link
Collaborator Author

/payload-job periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-3of3

@SchSeba
Copy link
Member

SchSeba commented Nov 11, 2025

/lgtm
/approve

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Nov 11, 2025
@openshift-ci
Copy link

openshift-ci bot commented Nov 11, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: aabughosh, SchSeba

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Nov 11, 2025
@openshift-merge-bot openshift-merge-bot bot merged commit bd81eb9 into openshift-kni:main Nov 11, 2025
7 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants