-
Notifications
You must be signed in to change notification settings - Fork 85
8359104: gc/TestAlwaysPreTouchBehavior.java#<gcname> fails on Linux #209
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
8359104: gc/TestAlwaysPreTouchBehavior.java#<gcname> fails on Linux #209
Conversation
I would like to have the patch in jdk25u as well, because the test issue is present there too. The patch is low risk and applies cleanly. |
👋 Welcome back asteiner! A progress list of the required criteria for merging this PR into |
@ansteiner This change now passes all automated pre-integration checks. ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details. After integration, the commit message for the final commit will be:
You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed. At the time when this comment was updated there had been 52 new commits pushed to the
As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details. As you do not have Committer status in this project an existing Committer must agree to sponsor your change. ➡️ To flag this PR as ready for integration with the above commit message, type |
This backport pull request has now been updated with issue from the original commit. |
|
/approval |
@ansteiner usage: |
/approval request Fix the failing test 8359104 |
@ansteiner |
/integrate |
@MBaesken Only the author (@ansteiner) is allowed to issue the |
/integrate |
@ansteiner |
/sponsor |
Going to push as commit 1c9880b.
Your commit was automatically rebased without conflicts. |
@shipilev @ansteiner Pushed as commit 1c9880b. 💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored. |
Progress
Issue
Reviewing
Using
git
Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk25u.git pull/209/head:pull/209
$ git checkout pull/209
Update a local copy of the PR:
$ git checkout pull/209
$ git pull https://git.openjdk.org/jdk25u.git pull/209/head
Using Skara CLI tools
Checkout this PR locally:
$ git pr checkout 209
View PR using the GUI difftool:
$ git pr show -t 209
Using diff file
Download this PR as a diff file:
https://git.openjdk.org/jdk25u/pull/209.diff
Using Webrev
Link to Webrev Comment