Skip to content

Major cli refactor #222

Major cli refactor

Major cli refactor #222

Triggered via pull request February 24, 2025 17:41
Status Failure
Total duration 3m 8s
Artifacts

ci.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

20 errors
tests (macos-latest, 3.11, highest)
Process completed with exit code 2.
tests (windows-latest, 3.10, highest)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (windows-latest, 3.12, highest)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (windows-latest, 3.11, highest)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (macos-latest, 3.10, highest)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (macos-latest, 3.10, highest)
Process completed with exit code 2.
tests (macos-latest, 3.12, highest)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (macos-latest, 3.12, highest)
The operation was canceled.
tests (ubuntu-latest, 3.10, highest)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (ubuntu-latest, 3.10, highest)
The operation was canceled.
tests (ubuntu-latest, 3.12, lowest-direct)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (ubuntu-latest, 3.12, lowest-direct)
The operation was canceled.
tests (ubuntu-latest, 3.11, lowest-direct)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (ubuntu-latest, 3.11, lowest-direct)
The operation was canceled.
tests (ubuntu-latest, 3.10, lowest-direct)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (ubuntu-latest, 3.10, lowest-direct)
The operation was canceled.
tests (ubuntu-latest, 3.12, highest)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (ubuntu-latest, 3.12, highest)
The operation was canceled.
tests (ubuntu-latest, 3.11, highest)
The job was canceled because "macos-latest_3_11_highest" failed.
tests (ubuntu-latest, 3.11, highest)
The operation was canceled.