You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Sometimes a team starts a new project and we want to extract data from two projects as one.
Since their columns my not be the same, it is interesting if we can configure that, something like this
Sometimes a team starts a new project and we want to extract data from two projects as one.
Since their columns my not be the same, it is interesting if we can configure that, something like this
status_list=Backlog,To Do,In Progress,(BA Verify|Verify),QA Verify,Done
Take a look at (BA Verify|Verify)
It means that the algorithm would search for both status changes.
The text was updated successfully, but these errors were encountered: