Skip to content

Conversation

@kubicar
Copy link
Contributor

@kubicar kubicar commented Dec 2, 2025

Description

Changes proposed in this pull request:

  • ...

Pre-Merge Checklist

Consider all the following items. If your contribution violates any of them, or you are not sure about it, add a comment to the PR.

  • The code coverage is acceptable.
  • Release notes for the introduced changes are created.
  • If Kubebuilder changes were made, you ran make generate-manifests and committed the changes before the merge.
  • Pre-existing managed resources are correctly handled.
  • The change works on all hyperscalers supported by SAP BTP, Kyma runtime.
  • There is no upgrade downtime.
  • For infrastructure changes, you checked if the changes affect the hyperscaler's costs.
  • RBAC settings are as restrictive as possible.
  • If any new libraries are added, you verified license compliance and maintainability, and made a comment in the PR with details. We only allow stable releases to be included in the project.
  • You checked if this change should be cherry-picked to active release branches.
  • The configuration does not introduce any additional latency.

Related issues

werdes72
werdes72 previously approved these changes Dec 3, 2025
nataliasitko
nataliasitko previously approved these changes Dec 3, 2025
werdes72
werdes72 previously approved these changes Dec 3, 2025
@kubicar kubicar force-pushed the 1705-expose-trustDomain-in-Istio-CR branch from 40f76de to 6db5373 Compare December 8, 2025 14:57
nataliasitko
nataliasitko previously approved these changes Dec 10, 2025
@kubicar kubicar enabled auto-merge (squash) December 10, 2025 10:02
@kubicar kubicar merged commit 716b0b3 into kyma-project:main Dec 10, 2025
31 of 33 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants