Skip to content

chore: add --changedSince base SHA to Jest in CI#110568

Merged
JoshuaKGoldberg merged 4 commits into
masterfrom
frontend-jest-ci-changed-since
Mar 30, 2026
Merged

chore: add --changedSince base SHA to Jest in CI#110568
JoshuaKGoldberg merged 4 commits into
masterfrom
frontend-jest-ci-changed-since

fix: touchups to frontend-optional.yml; don't run if no merge base

5c9ae7e
Select commit
Loading
Failed to load commit list.
getsantry / getsentry / backend skipped Mar 26, 2026 in 12s

No relevant tests (no relevant getsentry tests)

View the workflow run on getsentry

Running against master

Details

More information

What is this?

This is a check to make sure your Pull Request passes tests on our private getsentry repo. We use GitHub Actions to
dispatch a workflow run on getsentry which creates this Check and eventually reports back the test results.

Read the below point on what to do if this Pull Request requires changes in getsentry.

What do I do if this is failing?

First, make sure your branch on sentry is update to date with master,
as getsentry could be depending on a change that exists in master but
does not yet exist on your feature branch.

If this check is still failing, it probably means the test(s) on getsentry are broken.

You will need to open a PR on getsentry, fix the problem, and add

Requires https://github.com/getsentry/sentry/pull/110568

in the PR description (NOT a comment) to have it run against this PR.