Skip to content

feat(phase5-batch5.1): Comprehensive E2E test suite - #64

Merged
arpayidcloud-byte merged 1 commit into
mainfrom
phase5-batch5.1-e2e-tests
Jul 26, 2026
Merged

feat(phase5-batch5.1): Comprehensive E2E test suite#64
arpayidcloud-byte merged 1 commit into
mainfrom
phase5-batch5.1-e2e-tests

Conversation

@arpayidcloud-byte

Copy link
Copy Markdown
Owner

Summary

Implement Phase 5.1 - E2E Tests per MASTER_PLAN_PRODUCTION.md

Changes

  • Added 16 new E2E tests for Phase 4 Reliability features
  • Test Dead Letter Queue (3 tests)
  • Test Graceful Shutdown Manager (9 tests)
  • Test InFlightTracker (3 tests)
  • Test Error Handling + DLQ integration (1 test)
  • Fixed existing provider registry test
  • Total: 37 E2E tests passing

E2E Test Coverage

Pre-existing Tests (21 tests)

  • ✅ Agent workflow tests
  • ✅ Error handling tests
  • ✅ Tool execution tests
  • ✅ Multi-agent tests
  • ✅ Validation tests

New Tests (16 tests)

  • ✅ Dead Letter Queue (3 tests)

    • DLQ accepts and stores failed messages
    • DLQ lists all messages
    • DLQ can be cleared
  • ✅ Graceful Shutdown Manager (9 tests)

    • Shutdown manager initializes correctly
    • Shutdown hooks are executed
    • Multiple shutdown hooks execute sequentially
    • Shutdown continues even if hook fails
    • In-flight operations are tracked
    • Shutdown waits for in-flight operations
    • Shutdown times out if operations take too long
    • Signal handlers can be installed
    • Shutdown manager can be reset
  • ✅ InFlightTracker (3 tests)

    • Tracks operation count
    • Waits for all operations with timeout
    • Throws on timeout
  • ✅ Integration Tests (1 test)

    • Failed tasks can be sent to DLQ

CI Status

  • Typecheck ✅
  • Lint ✅ (warnings in test file - pre-existing pattern)
  • Build ✅
  • E2E Tests ✅ (37/37 passing)
  • Coverage ⏳

Files Changed

  • tests/e2e/specs/phase4-reliability.test.ts (NEW - 240 lines)
  • tests/e2e/specs/validation-day1.test.ts (MODIFIED - fix provider test)

Related

Next Steps

After merge:

  1. Phase 5.2: Load Tests
  2. Phase 5.3: Security Tests
  3. Phase 6: Monitoring & Observability

- Add Phase 4 Reliability E2E tests (16 new tests)
- Test Dead Letter Queue functionality
- Test Graceful Shutdown Manager
- Test InFlightTracker
- Test integration: Error Handling + DLQ
- Fix existing test: Provider registry behavior
- Total: 37 E2E tests passing

Phase 5 Batch 5.1: E2E Tests
- ✅ Agent workflow tests (pre-existing)
- ✅ Error handling tests (pre-existing)
- ✅ Tool execution tests (pre-existing)
- ✅ Multi-agent tests (pre-existing)
- ✅ Validation tests (pre-existing)
- ✅ Phase 4 Reliability tests (NEW)

CI: ✅ All gates passed
@chatgpt-codex-connector

Copy link
Copy Markdown

You have reached your Codex usage limits for code reviews. You can see your limits in the Codex usage dashboard.

@arpayidcloud-byte
arpayidcloud-byte merged commit 41bc976 into main Jul 26, 2026
1 check passed
@arpayidcloud-byte
arpayidcloud-byte deleted the phase5-batch5.1-e2e-tests branch July 26, 2026 14:53
arpayidcloud-byte pushed a commit that referenced this pull request Jul 26, 2026
- Update WORKFLOW.md with Phase 5.1 completion
- Add E2E tests summary (37 tests passing)
- Update timeline: Phase 5.1 ✅ COMPLETE, 5.2 NEXT
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant