Skip to content

Run full integration tests weekly - #711

Merged
lipkau merged 3 commits into
masterfrom
codex/reduce-actions-usage
Aug 25, 2026
Merged

lipkau merged 3 commits into
masterfrom
codex/reduce-actions-usage

Conversation

@lipkau

@lipkau lipkau commented Aug 25, 2026

Copy link
Copy Markdown
Member

Summary

  • Change the full Cloud and Dockerized Server integration schedule from nightly to Sunday at 05:00 UTC.
  • Retain manual per-track dispatch.
  • Update integration documentation and add a workflow trigger test.

Why

PR and push smoke coverage remains unchanged. Weekly full suites retain API and Data Center drift detection while substantially reducing scheduled runner and Cloud API usage.

Validation

  • actionlint passed.
  • Workflow trigger test: 1 passed.
  • Full build/test outside the macOS sandbox passed 1,683 non-help tests; 42 existing generated-help parameter-type checks failed.

Related pull requests

lipkau added a commit to AtlassianPS/AtlassianPS.Configuration that referenced this pull request Aug 25, 2026
## Summary

- Filter the Continuous Release workflow_run trigger to master.
- Keep manual release dispatch unchanged.
- Add a workflow-contract assertion.

## Why

Pull-request CI completions currently create skipped Continuous Release
runs. Filtering at the trigger removes that workflow noise while
preserving the release path for successful master CI.

## Validation

- actionlint passed.
- GitHub Actions contract tests: 7 passed.
- Full build/test reached 945 passing tests; 5 existing generated-help
parameter-type checks failed.

## Related pull requests

- AtlassianPS.Configuration:
#45
- AtlassianPS.Standards:
AtlassianPS/AtlassianPS.Standards#56
- ConfluencePS: AtlassianPS/ConfluencePS#264
- JiraAgilePS: AtlassianPS/JiraAgilePS#49
- JiraPS: AtlassianPS/JiraPS#711
lipkau added a commit to AtlassianPS/AtlassianPS.Standards that referenced this pull request Aug 25, 2026
## Summary

- Filter automatic Continuous Release runs to completed CI workflows on
master.
- Keep manual dispatch for unreleased changes already on master.
- Update the release blueprint and add a trigger contract test.

## Why

PR CI completions do not participate in release preparation and
currently create skipped workflow runs.

## Validation

- actionlint passed.
- Workflow trigger test: 1 passed.
- Invoke-Build -Task Lint, Build, Test: 92 passed, 31 not run.

## Related pull requests

- AtlassianPS.Configuration:
AtlassianPS/AtlassianPS.Configuration#45
- AtlassianPS.Standards:
#56
- ConfluencePS: AtlassianPS/ConfluencePS#264
- JiraAgilePS: AtlassianPS/JiraAgilePS#49
- JiraPS: AtlassianPS/JiraPS#711
lipkau added a commit to AtlassianPS/ConfluencePS that referenced this pull request Aug 25, 2026
## Summary

- Run full Cloud and Data Center integration suites weekly on Sunday
instead of nightly.
- Filter Continuous Release to completed CI runs on master.
- Update workflow documentation and contract tests.

## Why

PR and push CI retain the existing smoke and platform coverage. Weekly
full integration runs preserve drift detection while reducing scheduled
runner use.

## Validation

- actionlint passed for both changed workflows.
- Workflow contract tests: 8 passed.
- Invoke-Build -Task Build, Test: 181 passed.

## Related pull requests

- AtlassianPS.Configuration:
AtlassianPS/AtlassianPS.Configuration#45
- AtlassianPS.Standards:
AtlassianPS/AtlassianPS.Standards#56
- ConfluencePS: #264
- JiraAgilePS: AtlassianPS/JiraAgilePS#49
- JiraPS: AtlassianPS/JiraPS#711
lipkau added a commit to AtlassianPS/JiraAgilePS that referenced this pull request Aug 25, 2026
## Summary

- Run Cloud and Dockerized Server integration suites weekly on Sunday
instead of nightly.
- Filter Continuous Release to completed CI runs on master.
- Add workflow trigger tests.

## Why

The existing PR and push CI coverage remains unchanged. Weekly full
integration runs preserve periodic environment checks while reducing
idle-repository usage.

## Validation

- actionlint passed for both changed workflows.
- Workflow trigger tests: 2 passed.
- Existing Standards consistency tests: 8 passed.
- Full build/test reached 596 passing tests; 2 existing generated-help
parameter-type checks failed.

## Related pull requests

- AtlassianPS.Configuration:
AtlassianPS/AtlassianPS.Configuration#45
- AtlassianPS.Standards:
AtlassianPS/AtlassianPS.Standards#56
- ConfluencePS: AtlassianPS/ConfluencePS#264
- JiraAgilePS: #49
- JiraPS: AtlassianPS/JiraPS#711
@lipkau
lipkau merged commit 33221b9 into master Aug 25, 2026
8 checks passed
@lipkau
lipkau deleted the codex/reduce-actions-usage branch August 25, 2026 11:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant