Skip to content

build(deps): bump actions/checkout from 6 to 7 #14

build(deps): bump actions/checkout from 6 to 7

build(deps): bump actions/checkout from 6 to 7 #14

Triggered via push June 23, 2026 12:53
Status Failure
Total duration 36s
Artifacts

ubuntu.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
test (gcc, ubuntu-24.04, meson)
Process completed with exit code 1.
test (clang, ubuntu-22.04, meson)
The strategy configuration was canceled because "test.gcc_ubuntu-24_04_meson" failed
test (clang, ubuntu-22.04, meson)
The operation was canceled.
test (gcc, ubuntu-22.04, meson)
The strategy configuration was canceled because "test.gcc_ubuntu-24_04_meson" failed
test (gcc, ubuntu-22.04, meson)
The operation was canceled.
test (clang, ubuntu-24.04, autotools)
The strategy configuration was canceled because "test.gcc_ubuntu-24_04_meson" failed
test (clang, ubuntu-24.04, autotools)
The operation was canceled.
test (clang, ubuntu-24.04, meson)
The strategy configuration was canceled because "test.gcc_ubuntu-24_04_meson" failed
test (clang, ubuntu-24.04, meson)
The operation was canceled.
test (gcc, ubuntu-24.04, autotools)
The strategy configuration was canceled because "test.gcc_ubuntu-24_04_meson" failed
test (gcc, ubuntu-24.04, autotools)
The operation was canceled.
test (clang, ubuntu-22.04, autotools)
The strategy configuration was canceled because "test.gcc_ubuntu-24_04_meson" failed
test (clang, ubuntu-22.04, autotools)
The operation was canceled.
test (gcc, ubuntu-22.04, autotools)
The strategy configuration was canceled because "test.gcc_ubuntu-24_04_meson" failed
test (gcc, ubuntu-22.04, autotools)
The operation was canceled.