Goal
Timebox the convergence sprint to three working days from implementation start, then enter real application work. This is an execution target, not a promise of green gates or permission to rename unfinished work as complete.
Admission checklist
No-go
Incorrect routing, stale navigation overwriting a newer page, server/client boundary failures, broken required runtime or install path block release. Beta.2.3 may deliver a clearly labeled preview for real application work if release admission is still blocked; incomplete Beta work stays open. No automatic Beta.2.4 or deadline waiver.
Part of #1322. Depends on #1320/#1321 and required cleanup slices. Authority: maintainer-approved 2026-09-07 plan, ADR-0152 and docs/current/VERSION_PLAN.md (documentation PR linked on the train root). Planning is not implementation or release evidence.
Two-core-product refinement (2026-09-07)
Accepted refinement — 2026-09-08 (supersedes conflicting earlier scope)
Governing plan (2026-09-08)
Maintainer-approved: ADR-0152, docs/current/VERSION_PLAN.md and #1341. Execution: https://github.com/orgs/open-element/projects/3. Acceptance checkpoints replace the three-day schedule. No automatic beta.2.4. Native/Lit are formal Framework Mode targets, not already-shipped support. Existing release records/versions remain unchanged; no closure without final-SHA evidence. examples/** stays frozen.
Approved executable maturation — 2026-09-09
alpha.1 is the public independently consumable integrated baseline. Existing real-slice/packed/runtime/correctness gates stay intact. Oxc production migration, TS7 full takeover and successful optional experiments are NOT new admission prerequisites. Carry explicit experiment results and unresolved work into Alpha; existing correctness/security failures remain severity-gated.
Scope: docs/architecture/alpha-maturation.md and VERSION_PLAN (planning PR #1342). Upstream contribution potential can justify bounded extra integration cost; no invented defects, PR quota or upstream-response release dependency. This update changes planned work, not implementation status.
Current supplemental review policy — confirmed 2026-09-09
Supersedes earlier AI-review availability merge prerequisites in this issue. Third-party AI review is supplemental and non-blocking. Report provider/API errors visibly; wrapper SUCCESS is not completed review and provider failure contributes zero independent review evidence. Required CI, fresh verifier and human review remain the merge gates. Retain #1343 (comment) as historical evidence. No provider/model switch or billing action is authorized.
Goal
Timebox the convergence sprint to three working days from implementation start, then enter real application work. This is an execution target, not a promise of green gates or permission to rename unfinished work as complete.
Admission checklist
No-go
Incorrect routing, stale navigation overwriting a newer page, server/client boundary failures, broken required runtime or install path block release. Beta.2.3 may deliver a clearly labeled preview for real application work if release admission is still blocked; incomplete Beta work stays open. No automatic Beta.2.4 or deadline waiver.
Part of #1322. Depends on #1320/#1321 and required cleanup slices. Authority: maintainer-approved 2026-09-07 plan, ADR-0152 and docs/current/VERSION_PLAN.md (documentation PR linked on the train root). Planning is not implementation or release evidence.
Two-core-product refinement (2026-09-07)
Do not confuse two core products with a mandatory two-package release. No new public compiler API or broad integration matrix is required for this admission.
Accepted refinement — 2026-09-08 (supersedes conflicting earlier scope)
No automatic beta.2.4 or deadline waiver; remain at the failed checkpoint.
Governing plan (2026-09-08)
Maintainer-approved: ADR-0152, docs/current/VERSION_PLAN.md and #1341. Execution: https://github.com/orgs/open-element/projects/3. Acceptance checkpoints replace the three-day schedule. No automatic beta.2.4. Native/Lit are formal Framework Mode targets, not already-shipped support. Existing release records/versions remain unchanged; no closure without final-SHA evidence. examples/** stays frozen.
Approved executable maturation — 2026-09-09
alpha.1 is the public independently consumable integrated baseline. Existing real-slice/packed/runtime/correctness gates stay intact. Oxc production migration, TS7 full takeover and successful optional experiments are NOT new admission prerequisites. Carry explicit experiment results and unresolved work into Alpha; existing correctness/security failures remain severity-gated.
Scope: docs/architecture/alpha-maturation.md and VERSION_PLAN (planning PR #1342). Upstream contribution potential can justify bounded extra integration cost; no invented defects, PR quota or upstream-response release dependency. This update changes planned work, not implementation status.
Current supplemental review policy — confirmed 2026-09-09
Supersedes earlier AI-review availability merge prerequisites in this issue. Third-party AI review is supplemental and non-blocking. Report provider/API errors visibly; wrapper SUCCESS is not completed review and provider failure contributes zero independent review evidence. Required CI, fresh verifier and human review remain the merge gates. Retain #1343 (comment) as historical evidence. No provider/model switch or billing action is authorized.