Goal

Timebox the convergence sprint to three working days from implementation start, then enter real application work. This is an execution target, not a promise of green gates or permission to rename unfinished work as complete.

Admission checklist

  • Element/Router core boundaries and UI reference scope and both Router modes are reviewable; no mandatory package-renaming campaign.
  • URLPatternList differential corpus and HTTP semantics pass; any conservative matching path is explicit and preserves ordered results.
  • Real list/detail/form/error flow passes direct access, refresh, navigation, cancellation, SSR/SSG and Element claim.
  • Cloudflare, Node and Deno pass the agreed support contract; Bun/Nitro smoke and browser matrix evidence are explicit. Missing evidence is not a pass.
  • Fresh packed consumer install/dev/build/run succeeds; no server code in client artifacts.
  • Cleanup diagnostics record removed owners/scripts/tasks/paths and every justified survivor; superseded executable paths are retired with their replacements.
  • Public API and migration/limitations docs match actual code. Carry nonblocking work to the 1.0 Alpha milestone with owners and acceptance criteria.
  • Release planning/automation supports beta.2.N -> 1.0.0-alpha.1 and distinguishes public 1.0 Alpha from historic unpublished v0.44 alpha workspaces ([beta.2.1] Generalize prerelease version semantics for Beta.2 patch releases #1323/[beta.2.3] Establish one release-state authority #1334).
  • Exact candidate evidence and existing release GO requirements pass before any tag/publish. Alpha uses npm alpha; latest remains stable.

No-go

Incorrect routing, stale navigation overwriting a newer page, server/client boundary failures, broken required runtime or install path block release. Beta.2.3 may deliver a clearly labeled preview for real application work if release admission is still blocked; incomplete Beta work stays open. No automatic Beta.2.4 or deadline waiver.

Part of #1322. Depends on #1320/#1321 and required cleanup slices. Authority: maintainer-approved 2026-09-07 plan, ADR-0152 and docs/current/VERSION_PLAN.md (documentation PR linked on the train root). Planning is not implementation or release evidence.

Two-core-product refinement (2026-09-07)

  • Standalone Element author -> compile -> pack -> plain HTML passes without Router or private workspace imports.
  • Compiler artifacts are versioned; browser JS and declaration graphs exclude compiler/Vite/Node-only dependencies.
  • Framework tooling reuses Element compilation. Foreign CE host behavior is proven without claiming universal SSR/hydration compatibility.
  • UI and reference applications validate the two core products; no separate UI completeness/replacement gate.
    Do not confuse two core products with a mandatory two-package release. No new public compiler API or broad integration matrix is required for this admission.

Accepted refinement — 2026-09-08 (supersedes conflicting earlier scope)

  • Admit only after beta.2.1 foundation/fork/repairs, beta.2.2 Native/Lit flow and beta.2.3 dual-mode qualification.
  • Both formal integrations have SSR/client continuation/action/navigation evidence and truthful support matrices.
  • Four independent consumer modes from [beta.2.3] Consolidate framework fixtures and consumer qualification #1333 pass; documentation/migration/sitemap match qualified outputs.
  • Final SHA full CI, ACTUAL review, fresh verifier and release GO. Insufficient-balance wrapper success is not review evidence.
    No automatic beta.2.4 or deadline waiver; remain at the failed checkpoint.

Governing plan (2026-09-08)

Maintainer-approved: ADR-0152, docs/current/VERSION_PLAN.md and #1341. Execution: https://github.com/orgs/open-element/projects/3. Acceptance checkpoints replace the three-day schedule. No automatic beta.2.4. Native/Lit are formal Framework Mode targets, not already-shipped support. Existing release records/versions remain unchanged; no closure without final-SHA evidence. examples/** stays frozen.

Approved executable maturation — 2026-09-09

alpha.1 is the public independently consumable integrated baseline. Existing real-slice/packed/runtime/correctness gates stay intact. Oxc production migration, TS7 full takeover and successful optional experiments are NOT new admission prerequisites. Carry explicit experiment results and unresolved work into Alpha; existing correctness/security failures remain severity-gated.

Scope: docs/architecture/alpha-maturation.md and VERSION_PLAN (planning PR #1342). Upstream contribution potential can justify bounded extra integration cost; no invented defects, PR quota or upstream-response release dependency. This update changes planned work, not implementation status.

Current supplemental review policy — confirmed 2026-09-09

Supersedes earlier AI-review availability merge prerequisites in this issue. Third-party AI review is supplemental and non-blocking. Report provider/API errors visibly; wrapper SUCCESS is not completed review and provider failure contributes zero independent review evidence. Required CI, fresh verifier and human review remain the merge gates. Retain #1343 (comment) as historical evidence. No provider/model switch or billing action is authorized.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions