Repository navigation
Commit 95fa9a1
committed
ci(v1): re-enable the Playwright suite on v1/main
`e2e_tests.yml` filtered on `branches: [main]` for both `push` and
`pull_request` — the same leftover as main.yml, but with a sharper
consequence: `main` never matches on this branch, so the filter matched
nothing and the suite has never run on `v1/main` at all. The branch's full
run history contains zero `Playwright Tests` runs, only
`Run install, format, lint, build, and test on every push` and `CLI Tests`.
Repointed both filters at `v1/main` so the gate actually gates. Unlike the
main.yml change this is a real behavior change — it turns a dead workflow
back on — so it is deliberately a separate commit.
Refs #2065
Signed-off-by: cliffhall <cliff@futurescale.com>1 parent c7dc8f7 commit 95fa9a1
1 file changed
Lines changed: 6 additions & 2 deletions
| Original file line number | Diff line number | Diff line change | |
|---|---|---|---|
| |||
1 | 1 | | |
2 | 2 | | |
| 3 | + | |
| 4 | + | |
| 5 | + | |
| 6 | + | |
3 | 7 | | |
4 | 8 | | |
5 | | - | |
| 9 | + | |
6 | 10 | | |
7 | | - | |
| 11 | + | |
8 | 12 | | |
9 | 13 | | |
10 | 14 | | |
| |||
0 commit comments