You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: docs/user-guide/shrink-expand.md
-6
Original file line number
Diff line number
Diff line change
@@ -31,12 +31,6 @@ Ensure the management port of the switch is connected to fabric management netwo
31
31
32
32
Before you decommission a switch from the Hedgehog Fabric, several preparation steps are necessary.
33
33
34
-
!!! warning
35
-
Currently the `Wiring` diagram used for initial deployment is saved in
36
-
`/var/lib/rancher/k3s/server/manifests/hh-wiring.yaml` on the `Control` node. Fabric will sustain objects within the
37
-
original wiring diagram. In order to remove any object, first remove the dedicated API objects from this file. It is
38
-
recommended to reapply `hh-wiring.yaml` after changing its internals.
39
-
40
34
* If the `Switch` is a `Leaf` switch (including `Mixed` and `Border` leaf configurations), remove all `VPCAttachments` bound to all switches `Connections`.
41
35
* If the `Switch` was used for `ExternalPeering`, remove all `ExternalAttachment` objects that are bound to the `Connections` of the `Switch`.
0 commit comments