Cycle revert: containment cycles

Why containment cycles are resolved by D4 — detach the SCC, the rule stated normatively in PLACEMENT_SPEC.md "Cycles — D4, detach the SCC". This document holds the problem, the counterexample that rules out iterate-and-revert, and the acceptance criteria an implementation must meet. D4 is not yet implemented in the crate (QUEUE.md 58).

Findings that stand outside the placement register

  1. Link cycles need only a render guard. An embedding renderer embeds each object at most once per root-to-leaf path and degrades to a navigation link on repetition: deterministic, local, convergent. For links, unreachability is deletion (intended), so no protocol mechanism is needed.
  2. Containment cycles are an island problem. Cyclic placements make content unreachable from every root; the question is where orphaned content surfaces, not renderer termination.

Setup

Each object has one containment register (PLACEMENT_SPEC.md); only its parent edge matters here (sibling order cannot create cycles). The op set determines a fallback chain per register:

L(x) = [ p₀(x), p₁(x), …, root(x) ]

p₀ is the rendered placement (the single head, or last-agreed under freeze); each pᵢ₊₁ is the next agreed placement strictly below pᵢ in the register's overwrites DAG, ending at the register root. L(x) is finite, non-empty, and a pure function of the op set.

  • All-creation is acyclic: to create X inside Y, Y must exist first, so creation edges follow causal order — the guaranteed floor.
  • Cycles need no conflicts: "A under B" and "B under A" can be two clean single-head registers, so cycle handling runs even when no register is contested.

Scope: one containment register per object. Transclusion's multi-slot references are handled by the render guard (finding 1).

Requirements

Render : op set → (x ↦ a position in L(x), or detached) must be:

  • R1 acyclic — the rendered placements form a forest;
  • R2 pure — a function of the op set alone (Law I);
  • R3 no winner — no cycle member keeps its placement by id (grindable) or by any rule a fabricated conflict could exploit;
  • R4 bounded blast radius — registers not implicated by a cycle render at p₀;
  • R5 component-local cost — recompute after one op is bounded by the affected component, never the oplog;
  • R6 deterministic flagging — the flagged set is a pure function of the op set;
  • and (Law II) admit an incremental cache provably equal to batch recompute under every delivery order.

Why iterate-and-revert fails

The natural rule — "members of a cycle advance down their chains until acyclic" — has a non-monotone step: advancing one register can dissolve one cycle and create another, so fixed-point confluence arguments do not apply. It does not even define a function:

L(A) = [ under B, under C, under R ]
L(B) = [ under A, under R ]
L(C) = [ under A, under R ]
p₀ edges: A→B, B→A, C→A        cycle {A, B}; C hangs off A

Synchronous (advance every member of every cycle):

step 1: A → C, B → R     A→C, C→A: new cycle {A, C}
step 2: A → R, C → R     acyclic      final: A@R, B@R, C@R

Advancing only A:

step 1: A → C            cycle {A, C}
step 2: A → R            acyclic      final: A@R, B under A, C under A

Two fixpoints from one op set (a Law I violation). The synchronous run also shows transient justification (B loses its placement to a cycle that A's reversion dissolves anyway) and bystander cascade (C, never on the original cycle, is reverted).

Candidates

rule verdict
D1 synchronous iterate-and-revert (advance all cycle members one step, repeat) rejected: deterministic and terminating, but has transient justification and bystander cascade, and an incremental cache must reproduce the exact synchronous stage sequence
D2 minimal reversion (max registers at p₀, subject to acyclicity) rejected: minimum-feedback-arc-set, NP-hard (R5); symmetric ties breakable only by id (R3). Restoration passes reintroduce winner-picking or oscillation
D3 sequential acceptance over a canonical op order rejected: order-dependence is the amplification machine (MOVE.md); an id order is grindable
— jump cycle members straight to the root rejected: mixed root/p₀ graphs still cycle, so it iterates again (D1 with bigger steps)
D4 detach every member of a cyclic SCC of the p₀ graph, once adopted

Why D4:

  • Confluence is structural: detaching only removes edges, so it cannot create cycles — no iteration, no schedule.
  • Smallest blast radius: the flagged set is exactly the p₀-cycle members (R4, R6). In the counterexample {A, B} detach and C keeps its placement.
  • No winner: all members detach equally; a fabricated cycle earns the attacker a flag, never a destination (R3).
  • Standard incremental algorithm: recompute SCCs of the affected component per op, O(component), with no stage replay.
  • Cost: a detached cluster is more jarring UX than reverting to an old place; the next Place naming the heads resolves it either way.

Acceptance criteria

An implementation of D4 must ship with:

  1. the definitional function, with proofs of totality, termination, determinism, acyclicity, and R3;
  2. schedule-independence (free for D4) and an incremental algorithm proven equal to it under all delivery orders (the Law II cache invariant);
  3. per-op cost bounded by the affected component, with the cycle-bomb row of the amplification audit re-verified (PLACEMENT_SPEC.md);
  4. a property harness: definitional recompute vs incremental maintenance over randomized op sets and delivery orders, generators biased toward chained supersessions, mixed root/moved edges, and cycle bombs — the containment analog of prop_index_matches_iterator;
  5. UI semantics for the detached cluster (a product decision as much as a protocol one).