You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Large gas turbine will stop after 239 methane buckets
Which side have you encountered the bug on?
Both
Steps to reproduce
Version: latest 1.0.1 from Modrinth, only ic2+gregtech+jei client
I have two valid turbines for test, assembled in chunk borders.
After processing 239 buckets of methane, the turbines completely stopped (1000-761 = 239)
Hitting it with a rubber mallet will display the message "Machine processing: Enabled" and the turbine will consume 1 bucket of methane, but the turbine will not continue to operate.
output.compress-video-online.com.1.mp4
Logs
No response
Additional context
It might be a bug in the muffler hatch. The turbine accumulates pollution and cannot get rid of it.
Also, muffler hatch have description problems.
The text was updated successfully, but these errors were encountered:
Describe the bug
Large gas turbine will stop after 239 methane buckets
Which side have you encountered the bug on?
Both
Steps to reproduce
Version: latest 1.0.1 from Modrinth, only ic2+gregtech+jei client
I have two valid turbines for test, assembled in chunk borders.
After processing 239 buckets of methane, the turbines completely stopped (1000-761 = 239)
Hitting it with a rubber mallet will display the message "Machine processing: Enabled" and the turbine will consume 1 bucket of methane, but the turbine will not continue to operate.
output.compress-video-online.com.1.mp4
Logs
No response
Additional context
It might be a bug in the muffler hatch. The turbine accumulates pollution and cannot get rid of it.
Also, muffler hatch have description problems.
The text was updated successfully, but these errors were encountered: