Skip to content

Latest commit

 

History

History
740 lines (596 loc) · 45.3 KB

LOCK.md

File metadata and controls

740 lines (596 loc) · 45.3 KB

LOCK

Codex/Cursor/manual parallel session mutex file. Use this file to declare the current writer scope before mutating the workspace.

Status

  • Lock State: RELEASED
  • Scope: defer.md, LOCK.md
  • Owner: Codex on behalf of repository owner
  • Session/Task: Audit deferred backlog against latest implementation and decisions
  • Branch/Worktree: docs/defer-all-backlog-20261010 / /workspace/work/memory-loop/agent-diva
  • Started At: 2026-10-10T13:29:53Z
  • Last Heartbeat: 2026-10-10T13:32:57Z
  • Expires At: RELEASED 2026-10-10T13:32:57Z

Handoff for this task

At 2026-10-05T11:13:10Z, mastwet explicitly directed Codex to continue on main with sidebar consistency and Oil Frontend compliance fixes. This took priority over Devin's prior lock, whose scope overlapped agent-diva-gui/src/** on feat/wails-go-host. The main worktree was clean at d81381f8 before the takeover; no product-file changes were overwritten. The iteration is verified and its local delivery record is complete at docs/logs/2026-10-diva-sidebar-oil-frontend/v0.0.1-sidebar-and-frontend-contract/. The lock is released; no push or package release was performed.

Handoff for this documentation update

TODOLIST.md now contains only three current DIVA/VIVY/Laputa follow-ups. The 47 non-current deferred backlog entries and their historical context are archived in defer.md; they remain deferred, not completed. No push.

Handoff for deferred-backlog audit

The 47 archived entries are being reconciled against DIVA main ceff6f2e, VIVY main 003bc01e, Laputa main 44f5a2c5, and the local memory-loop candidate worktrees. The dated status map is now in defer.md; markdown links and git diff --check passed, and TODOLIST.md remains unchanged. No product code or remote ref was changed; no push.

Handoff for this branch

The inherited Devin wave-1 lease expired at 2026-10-04T00:00:00Z. Its historical record below is stale, not an active lock for this new docs branch. The mainline merge is preserved at 5444795a2d9db31e158c2cf009d64697e6289e50. No other working branch or live workspace is modified by this handoff.

Lock Rules

  1. Read this file before editing files, running worktree-mutating commands, or preparing a commit.
  2. If Lock State is HELD and the heartbeat is still valid, do not modify files covered by Scope.
  3. If work must proceed in parallel, prefer an isolated git worktree or separate branch and still record the new scope here.
  4. Scope must name concrete files, directories, or modules.
  5. Refresh Last Heartbeat at least every 30 minutes while holding the lock.
  6. Record handoff notes before taking over a stale lock.
  7. Use GLOBAL only for repo-wide migrations, bulk formatting, or similarly broad work.

Active Lock

  • TODOLIST backlog deferral — RELEASED 2026-10-10T12:12:47Z; owner Codex; scope TODOLIST.md, LOCK.md; branch docs/defer-all-backlog-20261010; started 2026-10-10T12:11:59Z.

  • VIVY CI run 77 backlog update — RELEASED 2026-10-10T12:13:51Z; owner Codex; scope TODOLIST.md, LOCK.md; branch docs/defer-all-backlog-20261010; started 2026-10-10T12:13:25Z.

  • Archive deferred backlog and curate current attention — RELEASED 2026-10-10T12:22:00Z; owner Codex; scope TODOLIST.md, defer.md, LOCK.md; branch docs/defer-all-backlog-20261010; started 2026-10-10T12:20:00Z.

  • Narrow defer archive to recent unfinished follow-ups — RELEASED 2026-10-10T12:38:26Z; owner Codex; scope TODOLIST.md, defer.md, LOCK.md; branch docs/defer-all-backlog-20261010; started 2026-10-10T12:36:22Z.

  • Archive non-current backlog and clean current TODO — RELEASED 2026-10-10T12:38:54Z; owner Codex; scope TODOLIST.md, defer.md, LOCK.md; branch docs/defer-all-backlog-20261010; started 2026-10-10T12:38:26Z.

  • Audit deferred backlog against latest implementation and decisions — RELEASED 2026-10-10T13:32:57Z; owner Codex; scope defer.md, LOCK.md; branch docs/defer-all-backlog-20261010; started 2026-10-10T13:29:53Z.

  • Memory-loop S11 cursor and host-isolation increment — RELEASED 2026-10-10T09:05:08Z; Laputa 6c2bf3c1, VIVY 4504bfe8 plus test-fixture clarification a1bca54b and query timing diagnostic 9dd8150e, DIVA checkpoint commit pending. Mentle/Garden normal and race suites pass; actual-App ordinary valid foreign-cursor and injection tests pass; scope race passes without invoking the recall source. Injection race still returns material read failed; test-only source timings were 3.542s and 2.342s against the 750ms ContextHost timeout, cause unconfirmed. Evidence: docs/logs/2026-10-memory-loop-chain/v2.9.0-s11-hostbound-cursors/. S11 remains Planned; S09, backend recovery, workspace A/B and final candidate gates remain open. No push, merge or release.

  • Memory-loop unresolved-window and shared-state repair increment — RELEASED 2026-10-10T01:24:08Z; VIVY 114ad97a (with d72add09, ab5ed872), Laputa 256d1f1. Focused runtime85/actual composition12/race12 and concurrency30 pass, zero skips. Evidence: docs/logs/2026-10-memory-loop-chain/v0.4.0-state-concurrency/ and v0.3.0-recovery-and-literal-path/. Full local goal remains active; same-operation recovery, S03–S11 and final CI/source sealing/review remain open. Reclaim isolated scope before the next mutation. External Windows/live resource waits do not stop local repair. No push/merge/release or unattended service deployment.

  • Memory-loop reflection and Restart increment — RELEASED 2026-10-10T00:24:37Z; VIVY budget fix 9d35e50c, fixture cd080708. Combined diagnostic regression 10 pass/0 skip; default App 133 pass/9 conditional skips. Source sealing/full CI/review and local S03–S11 work remain open; Windows/live waits are separate. Evidence: docs/logs/2026-10-memory-loop-chain/v0.1.0-reflection-and-restart/. No push, merge or release.

  • Memory-loop source/environment continuous repair — RELEASED 2026-10-09T23:55:44Z; isolated execution branch. Source capture and accepted receipt recovery fixed, environment and native Linux blockers resolved; required VIVY CI and rebuilt native host tests pass. Evidence: docs/logs/2026-10-memory-loop-repair/v0.2.0-source-and-environment/. Full Story acceptance and S03–S11 developer work remain open; Windows/live resources are separate. No push, merge or release.

  • Memory-loop execution foundation — RELEASED 2026-10-09T18:26:08Z; isolated execution branch feat/memory-loop-verification-20261009. Test asset fix, evidence checker and paired VIVY/Laputa real-path fixtures locally committed. S01–S03 remain Blocked; MEM-S04-01 user-fact loss reproduced. Evidence and continuation: docs/logs/2026-10-memory-loop-verification/handoff.md. No push, merge, product acceptance or release. Worktrees preserved.

  • Superpowers Epic–Story memory plan package — RELEASED 2026-10-09T17:06:24Z; planning only, five Epics/thirteen Stories, shared contracts/runbook and static checker. Old entrypoints/backlog reconciled. No product execution or remote publication.

  • Memory loop verification planning — RELEASED 2026-10-09T15:41:52Z by Codex on behalf of repository owner; branch docs/memory-loop-verification-20261009; plan, index, backlog and iteration records only. Eight tasks, 28 cases, source links and 10-day schedule checked. No product tests, implementation, push or release.

  • DIVA chat bar and message stream width constraints optimization — RELEASED 2026-10-05T17:08:00Z by Antigravity on behalf of user; branch main, chat input container width constraints (52rem max, centered), chat message stream alignment, active plan panel width alignment, and iteration log maintenance. Vitest and production build passed.

  • DIVA Peach Sakura Pink default theme design language alignment — RELEASED 2026-10-05T15:52:00Z by Antigravity on behalf of user; branch main, default theme tokens, Peach Sakura Pink color scheme, button contrast improvements, settings previews, focused iteration log and lock maintenance. Tests and production build passed. No push or package release.

  • DIVA sidebar consistency + Oil Frontend compliance fixes — RELEASED 2026-10-05T12:14:53Z by Codex on behalf of mastwet; branch main, GUI source and Vitest config, focused iteration record, TODOLIST and lock maintenance. Tests, production build and expanded-sidebar browser smoke passed. No push or package release.

  • DN-W3-P1 Go/Wails migration planning — RELEASED 2026-10-04T01:18:32Z by Codex on behalf of mastwet; branch docs/wails-migration-20261004. Documentation, backlogs and source-reference archive only. Eight Story plans, nine requirements and six waves statically verified. Archive branch refs read back at exact paired SHAs; paired tags remain pending missing tag-write access. No product code, main merge or product acceptance.

  • DIVA Next closure wave 1 — EXPIRED (historical) by Devin (session devin-c016e7bc2d98433e93f645345cb937e5); branch feat/dn-closure-wave1; heartbeat 2026-10-04T05:30:00Z, expires 2026-10-08T00:00:00Z. Executing DN-0C/DN-4A/DN-0P/DN-0S per DN-C2-P1 plans; DN-0C fixture + C2-1 source mappings delivered. No PR/merge/release per execution contract.

  • DN-C2-P1 executable Story package — RELEASED 2026-10-03T10:27:02Z by Codex; branch docs/diva-next-detailed-architecture-20261003; 20 Plans, 9 waves, 9 requirements, source-path/link/contract/DAG checks recorded in v0.3.0 logs. Docs only; no implementation, product/native/cloud tests or owner acceptance. Publication uses the previously authorized design branch; no PR/merge/release.

  • DN-C2 detailed architecture — RELEASED 2026-10-03T08:53:29Z by Codex; existing isolated branch docs/diva-next-closure-20261003; design/ledger/ index, stage amendments, TODOLIST and v0.2.0 logs committed after static checks. Docs only; no product/native/cloud tests, external mutation, push or release. Detailed implementation and owner acceptance remain pending.

  • DIVA Next closure scope and preliminary architecture — RELEASED 2026-10-03T07:27:34Z by Codex; isolated local branch docs/diva-next-closure-20261003; scope docs/plans/diva-next/**, docs/archive/todolist/**, docs/logs/2026-10-diva-next-closure/**, TODOLIST.md, LOCK.md. Docs only; issue #15/#13/#8 and VIVY #18 wording read back. No code, instruction-file rewrite, native test, branch push or release.

  • DN-0 inventory and contract freeze — RELEASED 2026-09-30T23:59:00Z by Devin; scope docs/plans/diva-next/**, docs/logs/2026-09-diva-next-dn0/, TODOLIST.md, LOCK.md; documentation only. Delivered backend-separation-contracts.md + fixtures/core-rpc.json (capture pending), TODOLIST additions, index state update.

  • DIVA P0 action planning — RELEASED; owner Codex; branch docs/diva-p0-action-plan; scope docs/plans/diva-next/**, docs/logs/2026-09-diva-p0-plan/**, TODOLIST.md, LOCK.md; documentation only. Started/heartbeat 2026-09-30T22:53:38Z; released after documentation verification at 2026-09-30T23:01:10Z; no implementation or external changes.

  • DIVA Next wire-cut (DN-W) — RELEASED 2026-09-27T08:20:00+00:00 by Devin; scope GLOBAL (deleted all Rust crates, src-tauri, Cargo/CI/scripts build closure) + agent-diva-gui/** + root docs. Branch devin/1790495412-diva-next-planning.

  • DIVA Next planning package — RELEASED 2026-09-27T07:55:00+00:00 by Devin; scope docs/plans/diva-next/**, docs/logs/2026-09-diva-next-planning/**, LOCK.md; docs only, no code. Branch devin/1790495412-diva-next-planning off main 0fd005a1.

  • Correct Laputa architecture gate wording — RELEASED 2026-08-15T06:25:00+08:00 by Grok; R1-hold wording corrected. Docs only. No S1.

  • Schedule GUI in TODOLIST — RELEASED 2026-08-15T06:05:00+08:00 by Grok; UI-S2/S3/S4 scheduled. Docs only.

  • Unify Recap + TODOLIST — RELEASED 2026-08-15T05:50:00+08:00 by Grok; Recap semantics unified; TODOLIST refreshed. Docs only.

  • Create protection branch — RELEASED 2026-08-15T05:20:00+08:00 by Grok; protect/cognitive-pre-clean-break-20260815 @ 2aab18cc. Not pushed.

  • Approve D4 and freeze recap — RELEASED 2026-08-15T05:00:00+08:00 by Grok; D4 approved; S8 per-turn recap. No production code. No backup branch.

  • Approve D3 and draft D4 — RELEASED 2026-08-15T04:20:00+08:00 by Grok; D3 approved; D4 draft + review fixes. No production code. No backup branch.

  • Draft D3 Evolution/Skill — RELEASED 2026-08-15T03:00:00+08:00 by Grok; D3 design draft + review fixes. No production code.

  • Record D2 approval — RELEASED 2026-08-15T01:30:00+08:00 by Grok; D2 approved. No production code.

  • Approve D1 and draft D2 — RELEASED 2026-08-15T01:15:00+08:00 by Grok; D1 approved; D2 draft + review fixes. No production code.

  • Draft D1 Persona architecture — RELEASED 2026-08-15T00:10:00+08:00 by Grok; D1 design draft + review fixes. No production code.

  • Freeze D0 A/B/C — RELEASED 2026-08-14T23:05:00+08:00 by Grok; P22 + S1 revision + D7. No production code.

  • Draft D0 domain-authority ADR — RELEASED 2026-08-14T22:10:00+08:00 by Grok; D0 design draft + architect review fixes. No production code.

  • Freeze S9/P21 MEMRULES — RELEASED 2026-08-14T20:25:00+08:00 by Grok; MEMRULES out of Laputa, GA-style write-time inject. No production code.

  • Clarify AutoDream Laputa allow/deny matrix — RELEASED 2026-08-14T10:35:00+08:00 by Grok; P19 allow/deny matrix. No production code.

  • Reject AutoDream persona writes; schedule diagnostic — RELEASED 2026-08-14T00:20:00+08:00 by Grok; P19 + Evolution D5 + TODOLIST diagnostic. No AutoDream production code.

  • P18 v1-closed roster, team-extensible kinds — RELEASED 2026-08-13T22:50:00+08:00 by Grok; P18 recorded. No production code.

  • Record IDENTITY body + DARK.MD booths — RELEASED 2026-08-13T22:25:00+08:00 by Grok; P17 DARK booths + IDENTITY body recorded. No production code.

  • Persona authority Markdown roster decision revision — **RELEASED 2026-08-13T21:45:00+08:00byGrok`; decision record P1/P13–P16 + current-boundary sync. No production code.

  • COGNITIVE-R4-CLEAN-BREAK-SAFETY research package — RELEASED 2026-08-13T20:55:00+08:00 by Grok; documentation-only R4 research package delivered under docs/research/cognitive-r4-clean-break-safety-2026-08/ plus logs/index. No production source/config/build changes.

  • COGNITIVE-R3-PERSONA-WORKSPACE research package — RELEASED 2026-08-13T20:15:00+08:00 by Grok; documentation-only R3 research package delivered under docs/research/cognitive-r3-persona-workspace-2026-08/ plus logs/index. No production source/config/build changes.

  • COGNITIVE-R2-STM-CONTEXT research package — RELEASED 2026-08-13T19:05:00+08:00 by Grok; documentation-only R2 research package delivered under docs/research/cognitive-r2-stm-context-2026-08/ plus logs/index. No production source/config/build changes.

  • COGNITIVE-R0-CURRENT-STATE research package — RELEASED 2026-08-13T17:20:00+08:00 by Grok; documentation-only R0 current-state inventory delivered under docs/research/cognitive-r0-current-state-2026-08/ plus logs/index. No production source/config/build changes.

  • COGNITIVE-R1-GENERICAGENT-EVOLUTION research package — RELEASED 2026-08-13T13:30:00+08:00 by Grok; documentation-only R1 research package delivered under docs/research/cognitive-r1-genericagent-evolution-2026-08/ plus logs/index. No production source/config/build changes.

  • Collect remaining archive-root legacy files and refresh archive package — RELEASED 2026-08-13T10:07:16+08:00 by Codex; documentation-only cleanup of seven legacy files left beside the archive index, plus ZIP/manifest refresh is complete. No source, config, or build files were changed; tests were not run per user instruction.

  • Consolidate pre-existing archive batches and compress legacy corpus — RELEASED 2026-08-13T10:05:19+08:00 by Codex; documentation-only consolidation of already archived historical batches under docs/dev/archive(old-docs-dont-read-me)/; no source, config, or build files were changed, and tests were not run per user instruction.

  • Reorganize complete docs corpus and pre-August logs — RELEASED 2026-08-13T09:53:49+08:00 by Codex; documentation-only cleanup of the complete docs/ corpus, current architecture/research entrypoints, retained decision summaries, legacy archive folders, manifests, and ZIP packages is complete. Production source, config, and build files were out of scope; tests were not run per user instruction.

  • Cognitive workspace reset master EPIC — RELEASED 2026-08-13T02:47:47+08:00 by Codex; documentation-only orchestration committed in 0d2acb60. Today's product decisions are consolidated into R0-R4 research, D0-D4 architecture, and implementation gates; no production code or target architecture design was created.

  • STM cross-session clean-break decision — RELEASED 2026-08-13T02:35:20+08:00 by Codex; documentation-only decision committed in 503c836d. Freezes memory/persona/STM boundaries and GUI ownership while leaving storage, automation and context assembly to research.

  • Laputa first-run initialization decision — RELEASED 2026-08-13T02:26:10+08:00 by Codex; documentation-only decision committed in 544d1944. Records five-authority first-run initialization, direct atomic write, absence-only trigger, and lifetime Persona/WORLD history.

  • Persona workspace interaction decision — RELEASED 2026-08-13T01:45:30+08:00 by Codex; documentation-only decision committed in 6ff3744b. Records current-document, pending-change and history states, plus the boundary between content review and security approval.

  • Persona Markdown authority decision — RELEASED 2026-08-13T01:17:17+08:00 by Codex; Markdown authority, source/preview/diff workspace, direct-save boundary and zero-compatibility deletion direction recorded in 262a8297.

  • TODOLIST stale-record archive — RELEASED 2026-08-13T01:01:09+08:00 by Codex; root backlog reduced to 30 active items, full pre-cleanup snapshot and archive index recorded in 77bac367; no product code changes.

  • Governance / Persona / Evolution recovery — RELEASED 2026-08-12T23:24:30+08:00 by Codex; unified Memory approval authority, AutoDream proposal-boundary registration, Persona/Evolution resilient GUI state, full isolated just ci, GUI tests/build, and real-workspace read-only smoke complete in 78e2bcf5, d6f82ea3, ab4705e4, and df21bd17. Gateway PID 27624 is running the current branch; visual/state-changing M3 acceptance remains with user.

  • CTX-C5b canonical checkpoint implementation — RELEASED 2026-08-11T18:30+08:00 by Codex; canonical checkpoint clean break, focused/full validation, TODOLIST and iteration logs complete in commits 19a5bfec, c6e3ace4, and 12bb92ce; not pushed.

  • CTX-C5a final wire cache prefix implementation — RELEASED 2026-08-11T18:05+08:00 by Codex; provider final-wire snapshot, agent observer clean break, focused/full gates, TODOLIST and iteration logs complete.

  • CTX-C5e automatic deferred tool activation planning — RELEASED 2026-08-11T17:10+08:00 by Codex; technical plan, TODOLIST and iteration logs complete; no production-code changes.

  • CTX-C5 plan formatting follow-up — RELEASED 2026-08-11T16:30+08:00 by Codex; trailing whitespace removed in commit 1f91c0c7.

  • CTX-C5 lightweight context convergence plan and clean-break policy — RELEASED 2026-08-11T16:25+08:00 by Codex; technical plan, research index, TODOLIST and iteration logs complete; no production-code changes.

  • CTX-C4 deferred tool discovery, same-turn mount, and recall verification — RELEASED 2026-08-11T10:20+08:00 by Codex; implementation and final verification complete in commits 66fb1ed4, 8b79fcac, 2747462d, 646b50c0, and 07bc4ee0; not pushed.

  • None. merge feat/gmh41-budget-closure + fix/small-fixes-batch — owner QoderCN — RELEASED 2026-08-11T09:39+08:00; merges 8c1f5b39 (GMH batch) + c05ce32a (small-fixes) on agent-diva-pro, marker cleanup a1a60355, TODOLIST bookkeeping 5245e92f; gates green except the 6 pre-existing CLI wiremock 502 cases; not pushed.

  • None. CTX-C3 tool-result artifact references and microcompact released 2026-08-11T09:18+08:00; see Handoff Notes.

  • small-fixes-batch (gateway port config + clippy lint batch) — owner QoderCN — RELEASED 2026-08-11T09:40+08:00; MERGED 2026-08-11 via c05ce32a(3 commits:83b87787 / 1aba27a3 / 2ccb05e6).

Handoff Notes

  • 2026-08-14T00:30:00+08:00: Released I1-S1 after stopping Frozen Core null section seeds and WORLD.MD pre-seeding. Laputa/Manager tests, just fmt-check, just check, and full just test passed. Code commit 559faa8d; S2/S3/S4 remain separately gated.

  • 2026-08-15T06:25:00+08:00: Corrected stale R1-hold gate in laputa architecture pack.

  • 2026-08-15T06:05:00+08:00: GUI scheduled in TODOLIST as UI-S2/S3/S4.

  • 2026-08-15T05:50:00+08:00: Recap wording unified; TODOLIST caught up.

  • 2026-08-15T05:20:00+08:00: Protection branch created locally at 2aab18cc. Not pushed. S1 not started.

  • 2026-08-15T05:00:00+08:00: Released after D4 approval and S8 Recap revision. Next: user says 切 then S1. Docs only.

  • 2026-08-15T04:20:00+08:00: Released after D3 approval and D4 delivery draft. Backup only when user says 切. Docs only.

  • 2026-08-15T03:00:00+08:00: Released after D3 Evolution/Skill design draft. Awaiting user review. Docs only.

  • 2026-08-15T01:30:00+08:00: Released after recording D2 approval. Docs only.

  • 2026-08-15T01:15:00+08:00: Released after D1 user approval and D2 design draft. D2 awaits review. Docs only.

  • 2026-08-15T00:10:00+08:00: Released after D1 Persona design draft. Path {config_dir}/persona/. Awaiting user review. Docs only.

  • 2026-08-14T23:05:00+08:00: Released after freezing D0 A/B/C as P22 / S1 revision / D7. One-machine companion; BML follows persona; distill always Evolution review. Docs only.

  • 2026-08-14T22:10:00+08:00: Released after D0 design draft. Open questions A/B/C in domain-authority.md §11. Docs only.

  • 2026-08-14T20:25:00+08:00: Released after freezing S9/P21 MEMRULES. Not a persona file; {config_dir}/memory/MEMRULES.MD; Memory settings editable; context like GA L0. Docs only. No production code.

  • 2026-08-14T10:35:00+08:00: Released after correcting P19: AutoDream is a Laputa proposal generator with an allow/deny matrix, not a total ban.

  • 2026-08-14T00:20:00+08:00: Released after recording AutoDream-must-not-write persona (P19/D5) and diagnostic backlog. Source inventory confirmed two propose-only paths (agent tool + AutoDream emit). Docs only.

  • 2026-08-13T22:50:00+08:00: Released after P18 (v1 closed set, team-extensible kind registry, users cannot add authority kinds). Docs only.

  • 2026-08-13T22:25:00+08:00: Released after recording IDENTITY-includes-body and DARK.MD FEAR/SHADOW booths. Docs only.

  • 2026-08-13T21:45:00+08:00: Released after writing authority roster into the Persona decision record and syncing current product-facing entries. No production source, config, or build changes.

  • 2026-08-13T21:20:00+08:00: Claimed Persona authority Markdown roster revision (REDLINE/USER/DREAM, uppercase names, Frozen Core 10-char DREAM).

  • 2026-08-13T20:55:00+08:00: Released after COGNITIVE-R4-CLEAN-BREAK-SAFETY documentation-only research package. Deliverables under docs/research/cognitive-r4-clean-break-safety-2026-08/ plus EPIC/index/TODOLIST/logs. No production source, config, or build changes; just ci not run (docs-only). No protect/* branch created. Architecture design remains blocked pending user Research Gate on R0–R4.

  • 2026-08-13T20:25:00+08:00: Claimed COGNITIVE-R4-CLEAN-BREAK-SAFETY documentation-only research package. Scope is research docs, EPIC/index, R0/R3 open-gap lines, TODOLIST R4/EPIC status, and iteration logs. No production source, config, or build changes.

  • 2026-08-13T20:15:00+08:00: Released after COGNITIVE-R3-PERSONA-WORKSPACE documentation-only research package. Deliverables under docs/research/cognitive-r3-persona-workspace-2026-08/ plus EPIC/index/TODOLIST/logs. No production source, config, or build changes; just ci not run (docs-only, same as R0/R1/R2). Architecture design remains blocked.

  • 2026-08-13T19:20:00+08:00: Claimed COGNITIVE-R3-PERSONA-WORKSPACE documentation-only research package. Scope is research docs, EPIC/index, R0 open-gap line, TODOLIST R3/EPIC status, and iteration logs. No production source, config, or build changes.

  • 2026-08-13T19:05:00+08:00: Released after COGNITIVE-R2-STM-CONTEXT documentation-only research package. Deliverables under docs/research/cognitive-r2-stm-context-2026-08/ plus EPIC/index/TODOLIST/logs. No production source, config, or build changes; just ci not run (docs-only, same as R0/R1). Architecture design remains blocked.

  • 2026-08-12T12:55:00+08:00: Released code-review residual scope. Runtime commits b4c10047, bb92204d, bdef0f87; approval e3f6660d; context/GUI d3dc56ed; docs/TODOLIST 93e07f75. just fmt-check, just check, focused Rust libs, GUI npm test (455/455) and npm run build passed. Final just ci also passed, including workspace tests, feature gates and BML clean-break gate. M3 real desktop smoke remains open in TODOLIST.

  • 2026-08-12T11:20:00+08:00: Merged feat/m3-hitl-closure into agent-diva-pro as 131d2dc5 (clean ort; S1–S5 three-mode HITL). TODOLIST backlog from review committed 586147cc; post-merge TODOLIST bookkeeping follows. Sandbox lib tests 127/127. Not pushed. Residual: dual-channel stream, human M3 smoke, Track A doc/UX gaps still open in TODOLIST.

  • 2026-08-12T10:45:00+08:00: Released line-review cache+HITL. Review log at docs/logs/2026-08-code-review-cache-hitl/v0.0.1-line-review/. Critical: M3 HITL S1–S5 lives only on feat/m3-hitl-closure (not merged into agent-diva-pro); HEAD Guardian still merges OnRequest|UnlessTrusted and ShellTool has no mode-driven Guardian. Track A C1–C5 is on HEAD.

  • 2026-08-12T01:10:30+08:00: Released G2D automated E2E coverage. Added agent-diva-manager/tests/autodream_laputa_e2e.rs with 6 Manager HTTP vertical scenarios and the four iteration log documents; TODOLIST records the automated gate and a pre-existing Windows stale-lock timing flake. Commit b4d2a84b; just ci passed; no push. G2D+ real desktop acceptance remains pending.

  • 2026-08-12T01:00:00+08:00: Claimed independent Manager HTTP automated E2E coverage for the G2D+ preparation batch. Scope is limited to the new integration suite, TODOLIST bookkeeping, and iteration logs; no production code or existing test files are to be changed unless a test exposes a focused defect.

  • 2026-08-12T01:00:00+08:00: Released C1c Skills Reload wiring. Added workspace-scoped Runtime Control, lazy all-Session skills invalidation, Manager upload/delete notifications, Applied-only memory_distill reload, upload no-op detection, focused tests, just ci, and CLI help smoke. Commits cdfb8e23 and 9639df5c; no push. LOCK remains intentionally uncommitted.

  • 2026-08-11T20:45:00+08:00: Claimed C1c Skills Reload wiring; superseded by the release note above after implementation, validation, and focused commits.

  • 2026-08-11T20:34:00+08:00: Released after C1c Workspace Memory Epoch implementation. Typed Provider authority/projection revisions, workspace-scoped Runtime Control refresh, apply/recovery/replay/rollback notification wiring, focused tests, just ci, and CLI help smoke passed. Commits bc989338 and 824ff890; no push. Skills reload remains a separate TODO.

  • 2026-08-11T19:03:17+08:00: Released after CTX-C5c/C5e/C5d tools lifecycle convergence. Canonical tool results, automatic deferred activation, three-region bounded context recovery, full gates, CLI help smoke, and deletion-proof passed. Commits: 6f1331f0, 3ce9eba2, e25a97fd, 0ffa01fb, 54715677, ce1dc08b; no push.

  • 2026-08-11T18:30:00+08:00: Released after CTX-C5b implementation. The workspace now has one bounded canonical_checkpoint_v1, one unified checkpoint compactor entry, tool-group-aware boundaries, and reactive turn-local pending updates. just ci, CLI help smoke, and the production deletion proof passed. C5c-C5e remain separate follow-up scope; no push.

  • 2026-08-11T18:05:00+08:00: Released after C5a closure. Final provider-wire cache snapshots and CORE-only tool prefix hashes are live; heuristic hit/miss state is deleted. Commits: 73dff1bc, a8747e86, 1673b2d8. Full just fmt-check, just check, just test, just ci, affected strict Clippy, and CLI help smoke passed. C5b is next; no push performed.

  • 2026-08-11T17:10:00+08:00: Released after adding C5e automatic deferred tool activation. The scheduled clean break retains tool_search, removes model-visible mount_tool and persistent discovered state, bounds the task-local active set, and preserves all authorization/approval gates.

  • 2026-08-11T16:25:00+08:00: Released after revising C5 into lightweight context convergence with a strict clean-break/no-compatibility policy and C5a-C5d slices. Documentation diff check passed; implementation remains pending and must use separate focused locks/commits.

  • 2026-08-11T10:20:05+08:00: Released after CTX-C4 implementation, focused and full workspace tests, just ci, strict affected Clippy, and CLI --help smoke all passed. No push performed. C4 iteration logs are in docs/logs/2026-08-context-management-enhancement/v0.0.9-c4-deferred-tool-discovery-recall/.

  • 2026-08-11T09:39:00+08:00: Released after merging both parked batches into agent-diva-pro (QoderCN, user-approved). feat/gmh41-budget-closure merged 8c1f5b39 (only LOCK.md conflicted: kept mainline notes + branch's 12:00 GMH closure note superseding the 10:15 interim; stray marker cleaned in a1a60355). fix/small-fixes-batch merged c05ce32a (clean). TODOLIST bookkeeping 5245e92f: GATEWAY-PORT-CONFIG-IGNORED and PROVIDERS-EXAMPLE-1.94-CLIPPY checked, laputa int_plus_one closed, LAPUTA-TESTS-1.94-ALL-TARGETS-CLIPPY added. Gates on merged tree: just fmt-check / just check green; just test fails only the 6 pre-existing CLI-WIREMOCK-502-PREEXISTING cases; CLI bin 16/16 including the two new gateway-port tests. Not pushed. Follow-up: remove merged worktrees agent-diva-gmh41 / agent-diva-small-fixes (pending user OK); gateway 端口人工验收仍挂人工测试汇总区。

  • 2026-08-11T09:18:00+08:00: Released after CTX-C3 closure. Secure session-persistent tool artifacts, structured full-output execution, versioned references, bound read_tool_result, main/supervised wiring, session deletion/startup GC, and C2-driven oldest-first microcompact are complete. Commits: b6959dc2, 02fe040c, ffff0fe6, cdc88fe7. Full just fmt-check, just check, just test, just ci, affected strict all-target Clippy, and CLI --help smoke passed. C4 remains next.

  • 2026-08-11T10:25:00+08:00: QoderCN edited TODOLIST.md with explicit user authorization while the CTX-C3 lock covers it: inserted a new aggregation section 「人工测试验收汇总(Human / Real-Device Smoke)」 between Operational Rules and Open Backlog. Follow-up (same user request, commit after this note): StepFun moved out of the manual section into a new 「E2E 自动化验收汇总」 section, which also aggregates the Wave 3 residual production-path E2E items. No existing items were moved, reworded, or checked. Mainline session: if in-flight TODOLIST edits touch those insertion points, keep both changes. Committed as standalone docs changes; LOCK.md itself left uncommitted (shared live mutex file).

  • 2026-08-11T12:00:00+08:00: Released GMH closure lock (QoderCN, feat/gmh41-budget-closure worktree agent-diva-gmh41). GMH-41/50/52 代码可完成 项全部落地并逐片单 concern 提交(未 push):S2a 删迁移死代码 93e9f5b6;S1b 拒绝熔断 321f4405;S1c offline 拒绝 9e772267;S2b migration feature flags 325c834d;S3 CI+deletion-proof 77380b5f;fmt f388dda6。just ci 仅剩既有 CLI-WIREMOCK-502-PREEXISTING 6 例失败(未触碰 agent-diva-cli)。day/hour 限额 已按用户决策推迟为待决策独立功能提案(见 TODOLIST.md)。 (supersedes the 10:15 interim note: S1b/S1c/S2b/S3 then pending.)

  • 2026-08-11T08:15:00+08:00: Released after CTX-C2 layered context budget and AssemblyReport closure. Stable rules, CORE/DEFERRED schemas, L1, WM, Recall, compaction, history, inline tool results and current turn are measured in typed layers; Recall drops explicitly under pressure; macro compaction and legacy count fallback report typed reasons. Agent 413 tests, strict Clippy, full just ci, clean-break and CLI help smoke passed. C3 is next.

  • 2026-08-11T09:40:00+08:00: Released small-fixes-batch (QoderCN, isolated worktree, no overlap with CTX-C2): 3 commits on fix/small-fixes-batch — 83b87787 gateway port config fix (cli), 1aba27a3 providers Rust 1.94 clippy lint batch, 2ccb05e6 iteration logs. Gates: just fmt-check / just check / cli bin 16/16 / providers --all-targets clippy + retry 11/11 green. Deferred until CTX-C2 releases TODOLIST.md: mark GATEWAY-PORT-CONFIG-IGNORED and PROVIDERS-EXAMPLE-1.94-CLIPPY done, close Laputa service 预存 clippy int_plus_one (verified already resolved), and add new entry LAPUTA-TESTS-1.94-ALL-TARGETS-CLIPPY (authority_boundary_guard / direct_write_guard / governance_proof_loop dead_code ×5, context_plane_invariants cmp_owned, authority_boundaries ×1).

  • 2026-08-11T02:14:55+08:00: Released after C1d prompt-cache observability closure. Provider cache profiles, explicit stable-system/core-tool anchors, classified prefix hashes, warmup-aware two-sample miss detection, and cache-token ledger persistence are implemented. Affected tests, strict Clippy, full workspace fmt/check/test, and CLI help smoke passed. just ci reaches only the pre-existing clean-break violation at agent-diva-laputa/src/bml/mod.rs:3; C2 is next.

  • 2026-08-10T23:44:12+08:00: Released after C1c/P0-2 SessionStable section cache. ContextBuilder now caches four stable sections and rendered prefix per session with typed break reasons and prefix versions; mask/L1 refresh is selective, reset/delete/shutdown are wired, and compact does not clear the cache. T5–T6, Agent 403 tests, full workspace fmt/check/test, and CLI help smoke passed. just ci reaches the final pre-existing clean-break violation at agent-diva-laputa/src/bml/mod.rs:3, recorded in TODOLIST. C1d is next.

  • 2026-08-10T22:27:59+08:00: Released after C1b/P0-3 tool schema stability. ToolRegistry now emits sorted CORE then DEFERRED definitions with recursive JSON object canonicalization; MCP/custom registration uses the deferred suffix. T4 covers repeat calls, reverse registration, and independent ToolAssembly rebuilds. Tooling 31, tools 115, agent 397, affected clippy, CLI help smoke, and full just fmt-check / just check / just test gates passed. Provider apply_cache_control was not changed. C1c/P0-2 is next.

  • 2026-08-10T18:44:07+08:00: Released after C1a/P0-1 typed stable-prefix production migration. Stable prompt now consumes C1-0 sections; time/session, WM, Recall, Plan/Ask/Scheduled use provider-aware post-prefix envelopes; reactive compaction reuses the same turn snapshot. Provider 122, agent 396, compaction integration 11, compaction E2E 15, and full just fmt-check / just check / just test gates passed. C1b tool schema stability is next.

  • 2026-08-10T01:15:00+08:00: Released after freezing context-management construction decisions DEC-CTX-A..G across README/C0/C1: provider-aware volatile serialization, typed C1 migration, explicit snapshot invalidation, atomic tool/cache changes, artifact safety, same-turn mount, and classified cache observability. Documentation-only revision; diff check clean.

  • 2026-08-10T00:45:00+08:00: Released after C1-0 context contract and characterization closure: provider-neutral section/stability/order skeleton, six focused contract/characterization tests, no production wire-shape change, agent lib 390 tests and full just fmt-check / just check / just test gates green. C1 stable-prefix migration remains next.

  • 2026-08-10T00:05:00+08:00: Released after recording the user-approved SEV-P1 disposition: OpenHarness aggregate closed except deferred EventBus Trait Hooks, Harness Gap prioritized next, and F3/GMH-52/Windows release/ CLARIFY-HITL deferred until later.

  • 2026-08-09T17:56:00+08:00: Released LAPUTA-PERSONA-WORKSPACE after implementing and validating the singleton persona lifecycle workspace, session Frozen Core effectiveness projection, inline governance actions, and strict no-legacy-compatibility boundary.

  • 2026-08-07T23:55:00+08:00: Released after LAPUTA-COGNITIVE-SYNC (S0–S7) closure: 15 commits on feat/laputa-cognitive-sync(未 push)— S0 基线修复 88195ffa;S1 cognitive/MEMRULES 41e60a7e;S2 WORLD.MD claim 存储+治理 upsert 5788eddf/b22b50e8;S3 Frozen Core 会话冻结 1c97d7be;S4 人格文件层退役 49e778e1/57044ba8/989a18a2;S5 注册表 14→8 硬删 e61630b8;S6 报告边界重构+D2 产物迁移 23ea4b1e/856335b2/6def944e;S7 Context Plane 负向不变量矩阵 2457239b;另 3 笔 TODOLIST docs 提交。全量 just ci 仅余 6 个基线 预存在 CLI wiremock 502 失败(CLI-WIREMOCK-502-PREEXISTING)。 S6-4 节律以进程级集成测试验证,完整 daemon-cron 真机挂 G2D+。 四件套:docs/logs/2026-08-laputa-cognitive-sync/ (plan/summary/verification/acceptance)。待用户评审合并分支。

  • 2026-08-07T14:00:00+08:00: Took over stale Wave 5 S2 lock (expired 2026-08-07T13:30+08:00, no heartbeat after 11:30; 核实该锁对应工作已 全部提交——16aa46ed Wave 5 S2 superseded gate、166e499a Wave 5 收口、Wave 6 亦已 close,仅锁文件未释放,无丢失工作)。新任务 LAPUTA-COGNITIVE-SYNC 开工清理: 3 commits 落袋(提案+TODOLIST 冻结 2c3fbe5e、根文档归位 docs/ + crate AGENTS fca1505e、legacy archive 清理 23bf2de9);工作树清零 后从 agent-diva-pro 切 feat/laputa-cognitive-sync 开始 S1。

  • 2026-08-06T22:30:00+08:00: Released after GA-MEM-PARITY Wave 4 (AutoDream G4 dedup) closure: 3 commits — f042bba4 laputa LaputaService::applied_authority_digests + new LaputaError::InvalidState(String) variant + service wave4_tests × 3; a39638bb autodream worker dual-path digest merge (legacy section + typed authority) + tracing::warn graceful degradation + worker wave4_tests × 3; 76dc772c docs close (TODOLIST WAVE4 checked + "Wave 4 延期项" G1/G2/G3/G5/G6/G7/G10/G11/G12 条目化 + memory-write-paths-contract.md "Realized in Wave 4" 追溯注脚 + v0.0.8 iteration logs). All gates green per slice (fmt/clippy -D warnings; laputa 38+9, autodream 14+6 suites); full workspace test only fails the 6 pre-existing CLI wiremock 502 cases (CLI-WIREMOCK-502-PREEXISTING). Wave 5 (consolidation 条目化 + B7 GC + F3/F4/F6/F7 延期项收口) or G2D+ 真机桌面验收 pending. Deferred to G2D+ / 后续独立 Wave: G1 手动触发端到端、G2 自动阈值触发联通、G3 多源输入闭环、G5 候选→proposal 端到端、G6 审查 UI、G7 节律报告可见、 G10 与 agent 即时记忆分工真机验证、G11 L4/salient 等价、G12 Action-Verified 公理对齐.

  • 2026-08-06T19:45:00+08:00: Released after GA-MEM-PARITY Wave 3 (read-side closure) closure: 3 commits — laputa wave3_tests (8 tests

    • supersedes-target production bug fix via new TypedMemoryStore::superseded_target_ids), agent wave3_tests (3 tests covering D2 prefetch degradation + D4 typed injection order), docs close (TODOLIST WAVE3 checked + F3/F4/F6/F7 延期条目化 + v0.0.7 iteration logs). All gates green per slice (fmt/clippy -D warnings; laputa lib 35 + 集成 9 / agent lib 386 + 集成 15); full workspace test (excluding CLI/GUI) green; CLI 6 pre-existing wiremock 502 cases remain (CLI-WIREMOCK-502-PREEXISTING). Wave 4 (AutoDream dedup, inventory §10.3 G4) pending. Deferred to Wave 5 / GMH-52: F3 GUI/CLI approval memory 端到端, F4 同会话热注入, F6 Rollback 端到端, F7 tombstone U3 完整路径.
  • 2026-08-06T17:25:00+08:00: Released after GA-MEM-PARITY Wave 2 (layers + working memory) closure: 7 commits — working memory trait surface + L1 budget config, typed L1 index rendering + session checkpoint (incl. deps lockfile), L0 policy + working memory turn injection + session end enumeration, update_working_checkpoint tool + distill evidence, docs close (TODOLIST WAVE2 checked + v0.0.6 iteration logs), CLI builtin gates wiring fix. All gates green per slice (fmt/clippy -D warnings; core 692 / laputa 27+ / agent 383 / tools 109 / manager); full workspace test only fails the 6 pre-existing CLI wiremock 502 cases (CLI-WIREMOCK-502-PREEXISTING). Wave 3 (read-side closure) pending; see TODOLIST WAVE3-MEMORY-READ-CLOSURE. Deferred to Wave 5: session-abort checkpoint residue GC, B9 enforced tool-result evidence binding.

  • 2026-08-06T15:35:00+08:00: Released after GA-MEM-PARITY Wave 1 (memory tool CRUD) closure: 6 commits — core CRUD trait surface, typed memory CRUD provider methods, legacy proposal-first CRUD + coordinator wiring, memory add/list/search/update/remove/distill tools, docs close (TODOLIST WAVE1 checked + v0.0.5 iteration logs). All gates green per slice (fmt/clippy -D warnings; core 682+/laputa 20+/agent 378+/tools 12+); full workspace test only fails the 6 pre-existing CLI wiremock 502 cases (CLI-WIREMOCK-502-PREEXISTING). Wave 2 (working memory/layers) and Wave 3 (read-side closure) pending; see TODOLIST WAVE3-MEMORY-READ-CLOSURE.

  • 2026-08-06T03:15:00+08:00: Released after GUI provider error/retry visibility fix (ERROR-SILENT + RETRY-VISIBILITY): 10 commits — core AgentEvent variants, providers retry listener channel (Arc callback + trait hook + ProviderTap forward), agent per-call listener injection, manager dual-stage idle timeout + SSE mapping, Tauri bridge provider events + broken-stream fallback, GUI retry/stall badges, e2e collector match, fmt, docs+TODOLIST. All gates green (fmt/check; core 678 / providers 127 / agent 372 / manager 109 / e2e 61 / GUI vitest 454 + vue-tsc). CLI smoke vs local 500-mock confirmed 1+3 retries + error propagation. HTTP SSE end-to-end + GUI desktop smoke pending (blocked by hardcoded gateway port 3000 while user gateway PID 8856 holds it; recorded GATEWAY-PORT-CONFIG-IGNORED). New TODOs: GUI-TAURI-PLAN-STREAM-DISCONNECT, PROVIDERS-EXAMPLE-1.94-CLIPPY, GATEWAY-PORT-CONFIG-IGNORED. User gateway/GUI processes untouched.

  • 2026-08-06T01:15:00+08:00: Released after recording GUI-PROVIDER-RETRY-VISIBILITY backlog entry (TODOLIST.md) per user instruction - record only, no fix.

  • 2026-08-06T01:05:00+08:00: Released after recording GUI-PROVIDER-ERROR-SILENT backlog entry (TODOLIST.md) per user instruction - record only, no fix.

  • 2026-08-05T22:35:00+08:00: Released after CLARIFY-HITL Phase 2 surface closed loop (ask_user): manager HTTP API + injection, CLI interactive (chat/tui), Tauri bridge, GUI QuestionCard with 2s polling; 4 feature commits + style cleanup; manager 106 / core 676 / tools 94 / agent 371 tests pass, GUI vitest 451 + vue-tsc clean, clippy -D warnings clean. Remaining: manual smoke with a real LLM (acceptance.md).

  • 2026-08-05T21:40:00+08:00: Released after CLARIFY-HITL Phase 1 运行时 MVP (ask_user 工具):core AskUserCoordinator、tools AskUserTool、装配+配置+ prompt、13 个新测试 + mock 集成闭环测试全绿;fmt/clippy 通过;受影响 crate 全量测试通过。全量 just test 仅有 6 个既有 CLI wiremock 502 失败(预存在, stash 验证,TODOLIST CLI-WIREMOCK-502-PREEXISTING)。Phase 2(GUI QuestionCard / CLI interactive / manager 注入)待独立迭代。

  • 2026-08-05T20:33:28+08:00: Released after archiving ask-user / conversational clarify HITL research (docs/research/ask-user-clarify-hitl-proposal.md, README index, TODOLIST CLARIFY-HITL, docs/logs/2026-08-ask-user-hitl-research/v0.0.1-research-archive/). Implementation pending.

  • 2026-08-05T19:05:00+08:00: Released after archiving sandbox+HITL approval proposal to docs/research/sandbox-hitl-approval-policy-proposal.md (+ README index, cross-link, docs/logs). Implementation still pending; see TODOLIST 审批三模式完善.

Handoff note — W1 evidence update (2026-10-04T02:30Z)

Devin session (on behalf of mastwet) updated docs/plans/diva-next/index.md and docs/plans/diva-next/wails/W1.md to record W1 Done state with the agent-vivy evidence pointer; lock state remains RELEASED for the previously recorded scope.

Handoff note — W2 wrapper scope (2026-10-04T05:35Z)

Devin session (on behalf of mastwet) took the lock on new branch feat/wails-go-host to implement W2 Task 6: scripts/build-desktop.py, build/vivy-sources.lock.json and just recipes. Product files outside the previous docs-only scope; created as new paths only.