Repository navigation
Remove owned correction links when forgetting support history - #74
Conversation
|
Independent review completed at dfc1398: PASS for the disabled foundation integration, no actionable findings. Fresh 76 affected tests and isolated SQL pass; exact-head Node 20/24/PostgreSQL run 39554963703 is green and explicitly executes the new scoped-erasure group. Review verified owner/configured-forum scope, memory erasure/opt-out committed before acknowledgment, other-scope preservation, late/concurrent writer fencing, retry, and refusal to claim complete deletion for partial/outage/unknown legacy results. Parent #49 also passed foundation review. Keep the parent integration/current-head CI requirement explicit before merging; this does not approve enabled memory, legacy reconciliation, real ingestion/validation or a live pilot. No production/customer/provider/Discord operation occurred. |
Customer failure prevented
Forgetting support history must also remove the customer's verified internal links to reviewed corrections, without erasing another scope or claiming complete deletion after failure.
Integrated current main
94e4f5762748590ca46f8e4a00690c808c6e38eb(#67) with merge commit7860417. Parent #49 is merged. All three release smokes have passed; the reviewer authorizes #67 then #74 merges once final checks pass. No new-code deployment or memory/context/fix-inbox enablement is authorized by this merge.Changes and limits
Verification
5e6707c2e9f7617b5ae16a5dccc6bdd20215e5e3: 952/952 npm tests, fresh before push. Integration offline customer eval 8/8 and combined isolated SQL pass.dfc13988413bf1bfd963e637f70017b5229527b9; only document conflicts needed resolution. Existing main recovery, deadlines and memory rehearsals retained.No new provider run, protected-input read, customer-data access, production DB operation, Discord post, setting/permission change or optional enablement. Full privacy/security/data-use/backup and enabled-pilot gates remain. Product progress stays 47/100, not accuracy.