Skip to content

Latest commit

 

History

History
55 lines (46 loc) · 3.21 KB

File metadata and controls

55 lines (46 loc) · 3.21 KB

Visualization Backlog

Status legend: done, in_progress, planned.

P0 - Core platform narrative

  • done - intents/01-intent-lifecycle-state-machine (.mmd .dot .svg .png)
  • done - intents/02-create-and-control-sequence (.mmd .dot .svg .png)
  • done - intents/03-policy-anatomy (.mmd .dot .svg .png)
  • done - intents/04-waiting-branches-and-wakeups (.mmd .dot .svg .png)
  • done - intents/05-delivery-and-processing-pipeline (.mmd .dot .svg .png)
  • done - intents/06-internal-scheduler-loop (.mmd .dot .svg .png)
  • done - intents/07-access-control-matrix (.mmd .dot .svg .png)
  • done - intents/08-audit-trail-map (.mmd .dot .svg .png)
  • done - platform/01-system-context-c4 (.mmd .dot .svg .png)
  • done - platform/02-container-runtime-c4 (.mmd .dot .svg .png)
  • done - api/01-api-method-family-map (.mmd .dot .svg .png)
  • done - security/01-authn-authz-enforcement-flow (.mmd .dot .svg .png)

P1 - Protocol, reliability, and security depth

  • done - protocol/01-protocol-envelope (.mmd .dot .svg .png)
  • done - protocol/02-versioning-and-deprecation-flow (.mmd .dot .svg .png)
  • done - protocol/03-idempotency-and-replay-protection (.mmd .dot .svg .png)
  • done - api/02-error-model-retriability (.mmd .dot .svg .png)
  • done - security/02-crypto-key-lifecycle (.mmd .dot .svg .png)
  • done - security/03-trust-boundary-dfd (.mmd .dot .svg .png)
  • done - operations/01-release-and-rollback-flow (.mmd .dot .svg .png)
  • done - operations/02-dr-backup-restore-flow (.mmd .dot .svg .png)
  • done - operations/03-observability-slos-alerts (.mmd .dot .svg .png)
  • done - security/04-secrets-management-rotation-flow (.mmd .dot .svg .png)
  • done - security/05-webhook-signature-verification (.mmd .dot .svg .png)
  • done - operations/04-capacity-latency-budget (.mmd .dot .svg .png)
  • done - operations/05-incident-response-swimlane (.mmd .dot .svg .png)

P2 - Advanced and website interactive views

  • done - protocol/04-schema-governance-compatibility (.mmd .dot .svg .png)
  • done - protocol/05-transport-selection-and-fallbacks (.mmd .dot .svg .png)
  • done - api/03-pagination-filtering-sorting-patterns (.mmd .dot .svg .png)
  • done - api/04-rate-limit-and-quota-model (.mmd .dot .svg .png)
  • done - platform/03-enterprise-placement-and-boundaries (.mmd .dot .svg .png)
  • done - platform/04-conformance-traceability-map (.mmd .dot .svg .png)
  • done - intents/09-intent-payload-extensibility-and-semantic-schemas (.mmd .dot .svg .png)
  • done - intents/10-human-in-loop-approval-branches (.mmd .dot .svg .png)
  • done - intents/11-resume-controls-policy-conflict-resolution (.mmd .dot .svg .png)
  • done - security/06-threat-model-stride-map (.mmd .dot .svg .png)
  • done - security/07-data-classification-and-encryption-zones (.mmd .dot .svg .png)
  • done - operations/06-runbook-decision-tree-top-incidents (.mmd .dot .svg .png)
  • done - operations/07-change-management-and-gates (.mmd .dot .svg .png)
  • in_progress - website/01-interactive-intent-journey.html (interactive HTML only)

Rollout rule

  • Promote to repository README only after terms and endpoint names are verified against current OpenAPI/runtime behavior.